Thursday, 14 February 2008

Back on the slip again

The end of the new quay by the crane acts as a repair site for smaller vessels that can be lifted out easily by the hydraulic crane....
still 'in situ', the masts in waiting for the Ripple......
visitors are having to wait here at the foot of Trewarveneth Street while road works are completed...
as topsides of the ABS begin to take shape....
and back up on the slip the Cathryn has lost her wheelhouse roof, replacement timbers sit on the horses.